fig6
From: Modelling of multi-sectoral critical infrastructure interdependencies for vulnerability analysis

Figure 6. Pipeline 1 (Sembcorp gas onshore 40-bar) with cost function of electricity grid vs. pressure vs. economic losses.
Figure 6. Pipeline 1 (Sembcorp gas onshore 40-bar) with cost function of electricity grid vs. pressure vs. economic losses.
All published articles will be preserved here permanently:
https://www.portico.org/publishers/oae/